Service Line: Downstream
Country: United Arab Emirates
Successfully supported massive high volume of uninterrupted breathing air supply projects at peak Turnarounds in red zone areas across Middle East.
Challenge:
Ensure a consistent source of breathing air supply for the end user and eliminate work interruptions caused by the need to refill breathing air.
Solution:
Different configurations of “fill-on-the-fly” breathing air supply systems, state-of-the-art air compression for high-volume needs, and a QA/QC and Dispatch System to manage equipment efficiently.
Result:
Positively impacted productivity and user confidence in equipment during peak turnarounds in red zone areas. Typical conditions involved varying durations of breathing air storage refilling, which interrupted work under demanding site conditions in red zone areas.
Key Customer Benefits
- Reduction in Overhead Costs Through Efficient Breathing Air Delivery
- Ensured Supply Meets Demand with Breathing Air Delivery Systems
- Fill-on-the-Fly” Technology Ensures Continuous Breathing Air Flow