Service Line: Upstream

Solution: Equipment Mobilization

Country: Brazil

United Safety’s quality equipment was deployed at project start up along with an aggressive nationalization development program, meeting timelines set out by customer to install and operate H2S and CO2 Detection and Protection Systems on 10 rigs, offshore in Brazil while simultaneously developing a competent local content of 60%.

Challenge:

Meet timelines set out by customer to install and operate H2S and CO2 Detection and Protection Systems on 10 rigs, offshore in Brazil while simultaneously developing a competent local content of 60%.

Solution:

Comprehensive range of equipment and personnel to ensure all local and customer requirements were met for project start up.

Result:

Exceeded customer expectations on equipment, technologies and local content by achieving an impressive 79.35%.

Key Customer Benefits

  • United Safety supplied quality equipment that exceeded local Brazilian requirements
  • Setting up human infrastructure in parallel to smooth functioning of the project and in keeping with local HR requirements
  • United Safety managed the complicated logistics, licensing issues and importation formalities in a smooth and reliable manner
  • Strong financial commitment from United Safety to ensure that sufficient resources were available to procure the required equipment and manage the project effectively
  • Going beyond the requirements of the job