Service Line: Downstream
Country: United Arab Emirates
Successfully supported massive high volume of uninterrupted breathing air supply projects at peak Turnarounds in red zone areas across Middle East.
Challenge:
Ensure a consistent source of breathing air supply for the end user and eliminate work interruptions caused by breathing air refilling.
Solution:
Different configurations of “fill-on-the ‑fly” breathing air supply. State-of-the-art air compression for high-volume air. QA/QC and Dispatch System to manage equipment.
Result:
Positively impacted productivity and user confidence on equipment during peak Turnarounds in red zone areas.