Search

Search all downloadable content

Sort Alphabetically

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

1 . Blowout Contingency Plan with a tiered Incident Command Structure for a large Carbon sequestration project

A tiered Incident Command Structure for a large Carbon sequestration project
Date: September, 2013
Service Line: OSIMS™
Solution: Blowout Contingency Plan
Country: United States
Description: United Safety worked with the client, a supplier of integrated project management solutions to produce response plans and operational flowcharts of different scenarios that adhered to industry best practices to address eventualities of a Blowout scenario in a large Carbon sequestration project.

Download A4 Size
Download Letter Size

2 . Conducting a root cause analysis of a well control incident

Conducting a root cause analysis of a well control incident
Date: July, 2013
Service Line: OSIMS™
Solution: Root Cause Analysis
Country: Algeria
Description: In order to investigate and a well control incident, United Safety facilitated a root cause analysis that determined key causal factors of an incident and recommended corrective actions to prevent it from recurring. We provided a qualified, objective investigation which contributed to improved HSE system.

Download A4 Size
Download US Letter Size

3 . Conducting a Well Control Incident Investigation and improving HSE performance.

Conducting a Well Control Incident Investigation and improving HSE performance.
Date: July, 2013
Service Line: OSIMS™
Solution: Root Cause Analysis
Country: Spain
Description: To help the client understand the root causes of a well control incident and instill the importance of monitoring and improving HSE performance United Safety provided a complete root cause analysis report including recommendations and technical support relating to local and regional HSE procedures.

Download A4 Size
Download US Letter Size

United Safety